1300 361 383

What is the minimum and maximum hire time?

Question: 
What is the minimum and maximum hire time?
Answer: 

The minimum length of hire is one day with no limit as to the maximum hire period. Please note that when a hire period over lays with the EWP’s quarterly or annual service, ACH will require site access in order to undertake the service on the machine.